7 Best Agile Project Management Software

Compare the best agile project management software and see how each handles sprint planning, reports, and collaboration.

Written By
Marianne Sison
Marianne Sison
Jul 22, 2026
13 minute read
Technology Advice is able to offer our services for free because some vendors may pay us for web traffic or other sales opportunities. Our mission is to help technology buyers make better purchasing decisions, so we provide you with information for all vendors — even those that don't pay us.

When it comes to agile project management software, Jira is often the default choice for IT and dev teams, but its steep learning curve can make adoption difficult for everyone else. monday dev and Trello handle agile workflows just as well, with simpler setup and a faster path to everyday use. In this article, I’m sharing eight platforms I’ve tested with my own team and what I found each one does best.

Best agile project management software compared


Best forStarting monthly fee
ClickUpBest AI-powered agile workflows$7/user
JiraBest for software issue tracking$9.05/user
monday devBest for roadmap-to-release planning$9/user
Zoho Sprints Best for low-cost Scrum planning$1/user
AsanaBest for marketing and product sprints $10.99/user
WrikeBest request-driven sprint intake$10/user
MiroBest whiteboard-based story mapping$8/user
TrelloBest lightweight Kanban boards$8/user

Why you can trust TechnologyAdvice

Over the past four years as a tech analyst, I have tested dozens of project management software, and several have become part of my agile workflow. 

Through buyer’s guides, I have learned to distinguish purpose-built agile software from general PM tools that have been modified to support Scrum or Kanban. I also assess each product using a comprehensive scoring rubric based on hands-on testing and verified product research.

Marianne Sison
Senior Staff Writer for Project Management

My methodology: What I specifically looked for

I used the same scoring rubric for each platform and prioritized features supporting agile project management. I checked their documentation to confirm each capability, then used my own testing process and customer feedback to assess ease of use and support.

  • General features (25%): I looked at how well each product supported backlog priorities and connected higher-level work to tasks or issues. I also reviewed sprint planning and agile reports, then scored dependencies and workflow automation separately.
  • Pricing (20%): I compared annual per-user pricing and free plan access. I also checked what came with the lowest paid plan, whether reports required an upgrade, and whether integrations added extra costs.
  • Advanced and niche features (20%): I reviewed how each platform managed roadmaps and capacity across multiple teams or projects. I also checked DevOps traceability, then assessed AI support and enterprise controls. 
  • Expert score (15%): I used the expert score to account for factors not fully reflected in the weighted categories. I considered feature quality and value first, then used recent user feedback and documentation as a final check.
  • Ease of use (10%): I looked at how much effort it took to set up an agile workspace and onboard a new team. I also considered the overall navigation and the admin work required to maintain custom workflows.
  • Support (10%): I compared the support options available on each plan and checked whether the community forum offered useful answers beyond the help center. I also reviewed the quality of the training resources and the security controls available to admins.

ClickUp: Best AI-powered agile workflows

Visit ClickUp
Overall Score 4.88/5

Pros

  • Sprint cards reflect current progress accurately
  • Unfinished tasks automatically move to the next sprint
  • Custom task types support mixed agile workflows

Cons

  • Large workspaces can load slowly
  • Extensive feature set can slow down admin onboarding
  • Access to AI agents requires a separate monthly subscription
ClickUp sprint folder showing four sprint lists and a Codegen task activity panel with a pull request link and updated files.
Manage sprint tasks while AI coding agents post dev updates. (Source: ClickUp)



Why I chose ClickUp

Testing ClickUp’s AI assistant, Brain, during a sprint cycle showed me it does more than draft text. Ask it to review a backlog list, and it will suggest task breakdowns. It can also identify which items are missing important details by using the information stored within your workspace. 

During an active sprint, Brain can summarize completed, ongoing, and blocked work using task statuses and comments. This saves someone from manually collecting updates across the board, though I would still have a product owner review the summary before sharing it with stakeholders. Brain reports what has been recorded, but it cannot decide which work should take priority.

Brain’s context is limited to what’s inside ClickUp unless you subscribe to the Everything AI plan, which searches connected tools such as Slack and Google Drive. If your sprint conversations happen mostly around a code repository, Jira’s Development panel links commits and pull requests to each issue without a separate AI plan.

Key features

  • Sprints ClickApp: Plan backlog work inside recurring sprint cycles with configurable durations and goals
  • Sprint automations: Move unfinished tasks into the next sprint when the current sprint closes
  • Sprint points: Estimate task effort and compare each assignee’s points against available capacity
  • Sprint dashboard cards: Compare committed points with completed points across recent sprints before setting forecasts

Pricing

  • Free plan: Includes unlimited members, task management, Kanban boards, and sprint management
  • Unlimited: $7/user/mo. Includes unlimited projects, Gantt charts, integrations, time tracking, and portfolio management
  • Business: $12/user/mo. Includes sprint reporting, advanced dashboards, workload management, and 5,000 monthly automations
  • Enterprise: Custom pricing. Includes advanced permissions, SAML SSO, audit logs, data residency, and higher automation limits

AI pricing note: Brain AI costs $9/user/mo. Everything AI costs $28/user/mo. Additional AI Super Credits cost $10 per 10,000 credits.

All prices above are billed annually.

Read our full ClickUp review.

Jira: Best for software issue tracking

Visit Jira
Overall Score 4.83/5

Pros

  • Epics connect to sprint backlogs
  • Agile reports track velocity and burndown
  • GitHub commits link directly to issues

Cons

  • Complex workflows need dedicated admins
  • Large backlogs can slow navigation
  • Plugins increase costs for specialized workflows
Jira team dashboard with sprint progress, story points, blocker count, assignees, issue results, and a sprint burndown chart.
Track sprint health, blockers, and burndown progress from one dashboard. (Source: Jira)



Why I chose Jira

Jira’s biggest advantage over general project management software is that it was designed around how dev teams plan and ship work. Instead of treating sprint tickets as isolated tasks, it connects them directly to the development activity behind each release.

After linking Jira to GitHub or GitLab, each issue gets a Development panel with linked branches, commits, pull requests, and builds. A project lead can quickly spot issues with active code changes that are still sitting in “To Do,” while Scrum and Kanban boards cover backlog management, sprint planning, and burndown reporting.

This approach works best when the team consistently treats Jira issues as the main record of dev work, which requires more setup and discipline than many nontechnical teams require. For business teams that need agile planning without a developer-first interface, Asana offers a much simpler workspace while its Jira Cloud integration keeps issue statuses synced.

Key features

  • Scrum backlog: Prioritize work items and move selected issues into current or future sprints
  • Velocity report: Compare forecasted work with completed work across sprints before setting commitments
  • Advanced Roadmaps: Build cross-project schedules from estimates and capacity while accounting for dependencies
  • Releases: Group sprint work into versions and monitor whether each release remains on schedule

Pricing

  • Free plan: Includes up to 10 users with projects, backlogs, boards, and basic automation
  • Standard: $9.05/user/mo. Includes permissions, team reports, integrations, and Rovo AI
  • Premium: $18.30/user/mo. Includes advanced planning, cross-project automation, unlimited storage, and 24/7 support
  • Enterprise: Custom pricing. Includes several sites, centralized governance, advanced analytics, and enterprise security

AI pricing note: Rovo Search, Chat, and Agents are included in paid plans. 

All prices above are billed monthly. Quotes can go lower with more seats and annual billing.

Read our full Jira review.

monday dev: Best for roadmap-to-release planning

Visit monday dev
Overall Score 4.55/5

Pros

  • Sprint boards support Scrum and Kanban
  • Custom workflows connect product and engineering
  • Automations coordinate release work across departments

Cons

  • Some users encounter issues with GitLab syncing
  • Cross-project reports may require external tools
  • Extensive customization increases setup time
monday.com sprint table with tasks organized by sprint and columns for owner, status, priority, issue type, estimated story points, and epic.
Compare sprint tasks by status, priority, type, and story points. (Source: monday.com)



Why I chose monday dev

monday dev runs as its own developer platform, separate from the monday work management product most people know. The platform links each roadmap item to its sprint tasks, so product managers can track the feature while developers manage the work required to deliver it.

The GitHub and GitLab integration syncs pull requests, merges, and reviews back to the related task automatically. Product managers can follow progress through the Roadmap Tracker while developers work from the Sprint Board. From there, the Engineering Performance Dashboard combines the underlying activity into a single sprint health view.

monday dev’s sprint management relies on several connected boards, and breaking those connections disables sprint tracking. Jira is a better option for teams that want native sprint and release reporting without linking unlimited boards.

Key features

  • Sprint management: Plan sprint tasks from one backlog and estimate commitments with story points
  • Roadmap Tracker: Connect roadmap items to sprint tasks and report quarterly progress to stakeholders
  • GitHub Integration: Sync repository activity with sprint items to reflect development status inside monday dev
  • Engineering Performance Dashboard: Compare sprint tickets with GitHub status to identify delivery issues before release

Pricing

  • Free trial for paid plans: 14 days
  • Basic: $9/user/mo. Includes development templates, basic dashboards, capacity planning, and AI sprint summaries
  • Standard: $12/user/mo. Includes sprint management, roadmaps, GitHub syncing, and 250 monthly automation actions
  • Pro: $20/user/mo. Includes agile reports, cross-team roadmaps, work hierarchy, and 25,000 monthly automation actions
  • Enterprise: Custom pricing. Includes advanced analytics, permission controls, enterprise security, and 250,000 monthly automation actions

AI pricing note: AI credits are included. Standard and Pro include AI Sidekick Lite. 

All prices above are billed annually.

Read our full monday.com review

Zoho Sprints: Best for low-cost Scrum planning

Visit Zoho Sprints
Overall Score 4.47/5

Pros

  • Capacity tools balance work across sprints
  • Release reports include burnup and burndown
  • Custom statuses show each handoff stage

Cons

  • GitHub syncing needs regular checks
  • Large projects may load slowly
  • Permissions complicate board setup
Zoho Sprints epics view showing backlog items and sprint tasks grouped into columns with story points, status, tags, and assignees.
Organize backlog items and sprint work by epic. (Source: Zoho Sprints)



Why I chose Zoho Sprints

Many small teams looking for Scrum software often face a choice between a basic Kanban tool that can’t handle story points and an enterprise platform that costs more than they need. Zoho Sprints provides dedicated Scrum tools without the higher cost or added complexity of broader work management platforms.

Teams can organize a prioritized backlog, break work into epics and user stories, estimate with story points, and plan sprints from a dedicated Scrum board. As work progresses, Zoho Sprints automatically generates velocity charts, burndown charts, and cumulative flow diagrams. This gives Scrum Masters an overview of sprint health without additional setup.

Note that Zoho Sprints focuses on Scrum, so teams that also need client project management or Gantt charts will likely need another tool. monday dev is the better choice if you want Scrum planning, roadmap management, and project tracking in one platform.

Key features

  • Capacity planning: Assign sprint work from available hours while accounting for leave and past performance
  • Release management: Group several sprints under one release and monitor work through configurable release stages
  • Agile reports: Compare forecasted work with completed work before planning the next sprint
  • Kanban WIP limits: Set work-in-progress limits for each status to prevent teams from accepting excess work

Pricing

  • Free plan: Includes three users, three projects, one parallel sprint, and basic agile reports
  • Starter: $1/user/mo. Includes 50 projects, epic management, timesheets, and agile reports
  • Elite: $2.50/user/mo. Includes unlimited projects, client portals, custom roles, and detailed permissions
  • Premier: $5/user/mo. Includes release management, capacity planning, custom fields, and workflow functions
  • Enterprise: $7.50/user/mo. Includes OKRs, budget tracking, test case management, and risk management

AI pricing note: Zoho Sprints connects with Zia, OpenAI, and other AI tools.

All prices above are billed annually.

Asana: Best for marketing and product sprints

Visit Asana
Overall Score 4.47/5

Pros

  • Cross-functional teams adopt boards quickly
  • Sprint backlogs track priorities and story points
  • Dependencies move connected task dates automatically

Cons

  • No built-in velocity or burndown reports
  • Dependency changes may require custom rules
  • Active projects can trigger excessive notifications
Asana bug-tracking list grouped into high, medium, and low priority sections with due dates, estimated hours, and assignees.
Prioritize bugs by urgency, due date, and effort. (Source: Asana)



Why I chose Asana

The problem with developer-first tools is that they often treat every unit of work as a ticket. Asana takes a broader approach by treating a sprint as a project with tasks, assignees, and dependencies, which fits a marketing or product launch as naturally as a software cycle. I would recommend it to cross-functional teams that follow agile practices but do not need software development workflows.

Teams can start with a sprint template, assign work, connect dependent tasks, and monitor workloads. When marketing or product teams work alongside engineering, Asana’s Jira Cloud integration syncs updates between an Asana task and its linked Jira issue, so both groups can follow progress from their preferred platform.

Asana doesn’t natively support story points, velocity tracking, or a product backlog, which can be limiting for engineering teams running Scrum. If your team needs native Scrum structure, Jira handles backlog, estimation, and sprint reporting.

Key features

  • Sprint planning: Create sprint projects and track backlog priority with custom fields and board sections
  • Auto-shifting Dates: Update dependent task dates automatically when one delivery date changes
  • Portfolio Workload: Compare team capacity across sprint projects before reassigning active work
  • Asana for Jira Cloud: Sync tasks and custom fields between business plans and engineering issues

Pricing

  • Free plan: Includes up to two users with unlimited tasks, projects, and basic board views
  • Starter: $10.99/user/mo. Includes Gantt views, project dashboards, unlimited automations, and 50,000 monthly AI Studio credits per account
  • Advanced: $24.99/user/mo. Includes portfolios, goals, workload management, and 75,000 monthly AI Studio credits per account
  • Enterprise: Custom pricing. Includes SAML, SCIM, workflow controls, and 200,000 monthly AI Studio credits per account
  • Enterprise+: Custom pricing. Includes additional compliance controls, audit logs, data residency, and managed workspaces

AI pricing note: AI Studio Basic is included with credit limits based on the plan.

All prices above are billed annually.

Read our full Asana review.

Wrike: Best for request-driven sprint intake

Visit Wrike
Overall Score 4.02/5

Pros

  • Custom workflows support Scrum and Kanban
  • Dashboards compare agile metrics across teams
  • Request forms add work to backlogs

Cons

  • Story points require custom field setup
  • Agile workflows need admin training
  • New users may struggle with navigation
Wrike active tasks report grouped by status with task titles, due dates, project folders, assignees, and duration data.
Review active assignments and overdue work across projects. (Source: Wrike)



Why I chose Wrike

Agile teams often struggle with a backlog filled with ad hoc requests from other departments instead of planned sprint work. If your team often handles work requests, Wrike lets you organize and prioritize incoming requests before they reach the backlog.

A dynamic request form can ask different questions based on each response, then automatically sets the resulting task’s assignee, priority, or approval chain. This means sprint planning starts with requests that are already categorized and routed, instead of a grooming session that involves sorting through raw requests.

Setting up branching request forms takes time and usually requires an admin. If your backlog comes from product planning rather than incoming requests, Zoho Sprints provides a simpler way to build and prioritize work within the Scrum process.

Key features

  • Custom workflows: Define Scrum or Kanban statuses that reflect each team’s delivery process
  • Dynamic request forms: Convert stakeholder requests into assigned backlog items using conditional intake rules
  • Workload Charts: Compare assigned effort against capacity before adding work to a sprint
  • Dashboards: Aggregate work across spaces to report overdue items and delivery risks

Pricing

  • Free trial for paid plans: 14 days
  • Free plan: Includes basic task management, Kanban boards, and table views
  • Team: $10/user/mo. Includes dashboards, interactive Gantt charts, and AI Essentials
  • Business: $25/user/mo. Includes configurable workflows, templates, standard integrations, and an AI Elite starter allowance
  • Pinnacle: Custom pricing. Includes capacity planning, budgeting, advanced reports, and higher AI action limits
  • Apex: Custom pricing. Includes AI-led workflow automation, whiteboards, and bidirectional integrations

AI pricing note: AI Essentials is included in Team. Business and higher plans include AI Elite actions. Extra action packs are available

All prices above are billed annually and only effective for purchases on or after January 21, 2026.

Read our full Wrike review.

Miro: Best for whiteboard-based story mapping

Visit Miro
Overall Score 3.79/5

Pros

  • Jira cards sync across planning boards
  • Dependencies sync with Azure DevOps
  • AI converts sprint plans into summaries

Cons

  • Splits portfolio work across boards
  • Jira tables require higher-tier AI access
  • Occasional users struggle to find tools
Miro planning board with Jira work items, team members, and a synced dependency panel showing one task blocked by another.
Map sprint dependencies visually to expose blocked work. (Source: Miro)



Why I chose Miro

Miro gives agile teams a visual workspace for sprint workshops and user story mapping. It offers two-way integrations with Atlassian apps such as Jira and Confluence, which largely benefits projects involving developers and product teams. 

Teams can import Jira issues as cards onto the Miro board, or turn Miro sticky notes into Jira issues, with updates syncing in both directions. Developers can stay in Jira while product managers and designers work in Miro, where stakeholders can follow the same work.

Miro is purpose-built for collaborative planning, so you’ll still need a separate agile project management software to manage sprints and reporting. If you’d rather plan and run sprints in the same platform, ClickUp combines sprint management and collaborative whiteboarding in one tool.

Key features

  • Planner for Jira: Prioritize Jira issues visually and compare story point totals during sprint planning
  • Dependencies for Jira: Create cross-team dependencies on the board and sync them directly to Jira
  • Estimation app: Run team estimation sessions and send agreed story points back to Jira
  • Jira Cards: Edit Jira issues during story mapping without leaving the planning board

Pricing

  • Free trial for paid plans: 14 days for Business.
  • Free plan: Includes unlimited members, three editable boards, Kanban formats, and trial AI access
  • Starter: $8/user/mo. Includes unlimited private boards, project spaces, facilitation tools, and 25 monthly AI credits per member
  • Business: $20/user/mo. Includes AI workflows, roadmapping tables, two-way development integrations, and 50 monthly AI credits per member
  • Enterprise: Custom pricing for 30 or more members. Includes centralized administration, advanced security, regional hosting, and custom AI credits

AI pricing note: Monthly credits are included, but extra credit packages can be purchased.

All prices above are billed annually.

Read our full Miro review.

Trello: Best for lightweight Kanban boards

Visit Trello
Overall Score 3.62/5

Pros

  • New users learn boards within minutes
  • Butler rules automate recurring card actions
  • Power-Ups extend lightweight Kanban workflows

Cons

  • Crowded boards tend to hide sprint priorities
  • Burndown charts require external Power-Ups
  • Large projects are difficult to navigate
Trello product launch board with cards organized into Helpful Launch Info, To Do, In Progress, Ready for Launch, and Launched columns.
Move continuous work through a Kanban workflow. (Source: Trello)



Why I chose Trello

Trello gives teams a lightweight Kanban board without the setup required for Scrum ceremonies or the ongoing upkeep of story points and agile reports. It keeps things simple with boards, lists, and cards that teams can start using immediately without configuring a sprint process first.

Card mirroring lets the same task appear on multiple boards, with updates syncing across each view. This is useful when a task needs to stay on a team’s working board while also appearing on a manager’s overview board. Teams that want more from their Kanban boards can add Power-Ups for extra features like story points or burndown charts.

Trello’s simplicity can become limiting as the team grows, since it lacks native tools for backlog prioritization, capacity planning, and sprint reporting. Zoho Sprints is a better option once you need the same card-based workflow with backlog management, story points, and velocity tracking.

Key features

  • Automation: Trigger card actions or updates when sprint workflow conditions are met
  • Card Mirroring: Edit one card across several boards without creating conflicting copies
  • Workspace Views: Review cards from several boards in one filtered table or calendar
  • Dashboard View: Compare card counts by list or assignee to spot workflow bottlenecks

Pricing

  • Free trial for paid plans: Premium trial available. 
  • Free plan: Includes up to 10 collaborators, 10 boards, unlimited cards, and 250 monthly automation runs
  • Standard: $5/user/mo. Includes unlimited boards, custom fields, card mirroring, and 1,000 monthly automation runs
  • Premium: $10/user/mo. Includes AI, dashboard reporting, Timeline view, and unlimited automation runs
  • Enterprise: $17.50/user/mo. Includes unlimited workspaces, organization permissions, Atlassian Guard, and enterprise support

AI pricing note: AI-powered Quick Capture is included in Standard. Broader writing and idea-generation tools are included in Premium and Enterprise.

All prices above are billed annually.

Read our full Trello review.

How to choose the best agile project management software

Every platform in this guide claims to support agile work, but that can mean anything from sprint-based Scrum with story points and velocity tracking to a basic Kanban board.. I recommend choosing based on how your team plans work and moves it through delivery, rather than comparing feature counts alone.

  1. Match the software to your team’s agile process: Scrum teams typically need backlog management, story points, sprint planning, and velocity reports. Marketing, creative, or operations teams may only need a Kanban board with recurring planning cycles, so adopting a Scrum tool can introduce unnecessary setup without improving how work gets done.
  2. Look beyond basic Git integrations: If your developers use GitHub or GitLab, check whether commits, branches, and pull requests automatically update the related work item. Otherwise, developers may finish the work while the task still appears in progress, leaving project managers with inaccurate sprint reports.
  3. Think about everyone using the platform: A tool built primarily for developers may feel overwhelming to marketing, operations, or client-facing teams. During a trial, ask non-technical users to submit requests, update tasks, and check project status to see whether they can navigate the platform without extra training.
  4. Follow how work reaches the backlog: Teams that create their own tasks may not need much more than a standard backlog. If work comes from clients, support, or other departments, test whether intake forms can automatically send requests to the right backlog and assign an initial priority.
  5. Test it with a live sprint: Import active work instead of starting with a blank project, then change priorities, add new tasks, or move deadlines halfway through the sprint. This quickly shows whether reports stay accurate automatically or require frequent updates.

FAQs

Is Jira the best agile project management software?

Jira is the most widely used option for software and IT teams, largely due to its extensive support for development workflows. It’s not the best fit for everyone, though. Its learning curve and complex functionalities lead many non-technical or smaller teams toward simpler alternatives like monday dev and Trello.

Is there free agile project management software?

Yes. Several platforms such as Jira and ClickUp offer free-forever plans with Kanban boards, task management, and basic sprint planning. However, advanced features like agile reports, automation, and roadmaps are usually reserved for paid plans.

Can non-software teams use agile project management software?

Yes. Although agile began in software development, its use of short work cycles, regular planning, and frequent reviews also works for marketing, design, and operations teams. The right tool depends on whether your team needs features such as backlog prioritization, story points, and velocity reports or only a flexible board for organizing and reviewing work.

Marianne Sison

Marianne is a technology analyst with nearly five years of experience reviewing collaborative work management solutions. She helps businesses identify the right tools and apply best practices to streamline workflows and improve project performance. Her insights on project management and unified communications appear in publications like Project-management.com, TechRepublic, and Fit Small Business.